Skip to main content

Consulting Service 03

Organizational Change Management & System Implementation

When you roll out ERP or CRM, reorganize, or push AI and digital transformation, we work on process, people and systems together so the new system actually gets used.
Suited to
Taiwan branches of multinationals, SMEs
Common situations
New departments, AI transformation, reorganization, family succession
Engagement
Project contract

What usually happens when you roll out a system but leave the organization alone?

The system goes live, yet people keep the old ways, data quality is poor, reports are still assembled by hand, and the investment never pays back.

  • Resistance and going through the motions

    Employees still work in Excel, email or the old process. Old and new processes run side by side and the workload goes up instead of down.

  • Department data does not match up

    Managers cannot get complete, accurate data from the system. Reports are patched by hand, and decisions go back to being talked through in meetings.

  • Delays and a scope that keeps shrinking

  1. 01Organization
  2. 02People
  3. 03Processes
  4. 04Management mechanisms

When a company implements Salesforce CRM, Microsoft Dynamics 365, ERP or another core system, the real challenge is usually not the technology. It is the process changes, role adjustments, new ways of working and shifts in management model that the implementation brings.

Read the full description

A large system implementation is, at its core, a change in how the business operates. Once processes are redesigned, responsibilities reassigned and information made more transparent, the way employees work, the way managers manage and the way departments collaborate are all affected.

So beyond answering whether the system works, the project must answer: Is the organization ready? Which roles are affected? Do employees know why the change is happening? Do managers know how to lead their teams through it? After go-live, will users really follow the new process and use the new system?

Using OCM (Organizational Change Management), MetricDomain works on the organization, people, processes and management mechanisms in parallel, helping the company reduce resistance, raise adoption and turn the new system into real operating capability.

Where do our consultants step in?

  1. 01

    Assess

    Transaction flows, data flows and current staffing
  2. 02

    Plan

    System architecture, roles and the change team
  3. 03

    Drive

    Communication, training, internal marketing and progress tracking
  4. 04

    Embed

    A data management rhythm and continuous improvement

Client stories

Background | Approach | Result

Go-liveGenuine business adoption
-NT$2.8M
Annual cost savings
+1.6x
Storage capacity
6 months
HQ relocation completed

From the client story:Leading Japanese cosmetics group

Asia-Pacific site of a European high-tech manufacturing group

D365 digital transformation and change management at a multinational manufacturer

Background

The group was rolling out a global core-system standardization program, implementing Microsoft Dynamics 365 across its Asia-Pacific operations. The Taiwan site covered sales, sales operations, finance, customer service, production and supply chain. Beyond adopting the global template, it also had to handle Taiwan-specific business processes, tax and regulatory requirements, customer transaction models and manufacturing needs.

There were four main challenges: gaps between the global template and actual local operations; highly interdependent cross-functional processes, where one role change could affect several departments at once; heavy reliance on manual work and Excel in existing processes; and roles and responsibilities that needed to be realigned.

Approach

Engaged in change management from the early project phase and integrated OCM with the implementation plan: built the change roadmap and governance structure; analyzed the change impact on each department and role; mapped as-is and to-be processes and clarified responsibilities and hand-offs; designed tiered communication and a key user mechanism by stakeholder group; planned role-based training and go-live readiness assessment; and after go-live tracked adoption, user feedback and adoption KPIs with ongoing reinforcement by managers.

Result

The project addressed more than the system implementation. It made the global system a management tool the local business could actually run on. Through OCM, global strategy, business processes, roles and responsibilities, system and data, communication and training, and user adoption were linked into one complete change management structure, so the digital transformation went beyond system go-live to genuine business adoption.

Evelyn Yang
Evelyn YangStrategy Consultant
Beauty & Cosmetics

Leading Japanese cosmetics group

Integrated multiple vendors within a tight schedule and budget to create an efficient, flexible and people-friendly mobile office. Open collaboration spaces and well-planned storage improved cross-functional communication, space utilization and the everyday workplace experience.

-NT$2.8M
Annual cost savings
+1.6x
Storage capacity
6 months
HQ relocation completed
Full case study
Background

A multinational beauty group with 25 brands and more than 2,600 employees needed to relocate its corporate headquarters across districts. More than half the staff had over 15 years of tenure and digital skills needed strengthening. An aging office and a rather traditional brand image also made it hard to attract and retain young talent.

Approach

Led the planning of the group's seven-floor headquarters, bringing 60 years of brand identity into the workplace to strengthen market and employee identification with the brand. Planned a site-wide digital transformation, built a new office environment that combined space and technology, and ran organizational and employee change management and training in parallel to reshape the employer brand and raise employee wellbeing.

Result

Integrated multiple vendors within a tight schedule and budget to create an efficient, flexible and people-friendly mobile office. Open collaboration spaces and well-planned storage improved cross-functional communication, space utilization and the everyday workplace experience.

What does the service cover?

  • Workforce review, organization design and restructuring
  • Change management
  • CRM and ERP planning and implementation support
  • IT systems planning and integration
  • AI process and tool design

Which companies is this service for?

  • Multinationals or top 300 groups setting up new departments or pushing AI and digital transformation
  • SMEs reorganizing, redesigning processes or handing over to the next generation
  • Companies whose systems are live but underused or underperforming

FAQ

Does every system implementation need OCM?

It depends on the degree of change, not the size of the system. If the implementation also changes processes, roles, responsibilities, ways of working or management systems, OCM should be included. The bigger the change, the higher the risk of handling only the technology and ignoring the organization.

We already have an IT team or a system integrator. Why do we need an OCM consultant?

The IT team and system integrator make sure the technology, functionality and deployment are delivered. OCM deals with the organization, processes, people, communication and adoption. The roles are different, and in large transformation projects they usually need to run in parallel.

Is OCM just training?

No. Training is only one part of OCM. A complete OCM program also covers change strategy, stakeholder management, change impact assessment, communication, manager involvement, organizational readiness, user adoption and post-go-live reinforcement.

What if employees resist the new system?

Resistance is rarely simple unwillingness to change. It often comes from not understanding why, roles being affected, heavier workload, lack of information or low confidence in new skills. We first identify the source of resistance, then set different strategies through communication, manager intervention, process adjustment and training.

The system is already live but usage is poor. Can it still be fixed?

Yes. An adoption assessment reviews actual usage, process design, user behavior, management requirements and data quality, and then sets an improvement plan. Many of these problems are not missing functionality but a management mechanism that was never built.

Can we engage you for OCM only, without the system build?

Yes. MetricDomain can work alongside your existing IT team, system integrator or software vendor and take responsibility for OCM, process, organizational communication, training and adoption management.

How are consulting fees calculated?

Fees are assessed on project size, system scope, number of users, departments involved, implementation period and OCM scope. After an initial interview we propose a scope and quotation based on the actual complexity of the change.

This service runs as a project contract

Consultants with different expertise form the project team, and a project lead tracks progress.